The Siemens HQ Project had been designed to 100% and the project was awarded to Al Fara’a Group as a lump sum contract. Masdar HQ was designed up to schematic level by Woods Bagot. The Project then was tendered and the appointed contractor was responsible to complete the design and construction of the building. With total build up area of 21,000 m2. The project is designed to 4 Pearls Estidama and LEED Platinum.
Total Man Hours: 5 million - Zero LTI LEED Platinum Award
Abu Dhabi, UAE